• Sitemap|中文|CAS
  • Home
  • About
    • Introduction
    • Mission
    • Message from the Director
    • History
    • Directors
    • Scientists
    • Organization
    • Contact Us
    • Phonebook
    • International
  • Science
    • Research Themes
    • Research Divisions
    • Facilities
    • Key Laboratories
    • Achievements
    • Journals
    • Papers
  • Newsroom
    • Highlights/News
    • Upcoming Events
    • IHEP in the Media
    • Photo and Video Gallery
    • Brochures
    • Media Contacts
  • Join Us
    • Introduction
    • Job Opportunities
    • Postdoc Mentors
    • Talent Programs
    • Study at IHEP
    • Internships
    • Contact Us
  • Visiting IHEP
    • Before you come
    • After you arrive
    • Useful Information
    • Q&A
  • Home
  • About
    • Introduction
    • Mission
    • Message from the Director
    • History
    • Directors
    • Scientists
    • Organization
    • Contact Us
    • Phonebook
    • International
  • Science
    • Research Themes
    • Research Divisions
    • Facilities
    • Key Laboratories
    • Achievements
    • Journals
    • Papers
  • Newsroom
    • Highlights/News
    • Upcoming Events
    • IHEP in the Media
    • Photo and Video Gallery
    • Brochures
    • Media Contacts
  • Join Us
    • Introduction
    • Job Opportunities
    • Postdoc Mentors
    • Talent Programs
    • Study at IHEP
    • Internships
    • Contact Us
  • Visiting IHEP
    • Before you come
    • After you arrive
    • Useful Information
    • Q&A
Highlights/News
  • 2025
  • 2024
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018
  • 2017
  • 2016
  • 2015
  • 2014
  • 2013
  • 2012
  • 2011
  • more
  • CSNS/RCS Ferrite-loaded cavity and biasing current supply prototypes developed
    Dec 31, 2010

    Ferrite-loaded cavity and biasing current supply prototype, the most important R&D item of the China Spallation Neutron Source (CSNS) Project, passed appraisal at the review meeting at IHEP on December 17, 2010.

    More >>

  • Strategic cooperation agreement signed between IHEP and LIP
    Dec 29, 2010

    The Institute of High Energy Physics (IHEP) and Lanzhou Institute of Physics (LIP), CAST signed a strategic cooperation agreement in Beijing on December 20, 2010.

    More >>

  • Sino-Japanese cooperation on R&D of superconducting technologies
    Dec 28, 2010

    Superconducting technologies are more and more applied to the construction of particle accelerators, hence having become one of the most important innovations fields in high energy physics machine building.

    More >>

  • BEPCII peak luminosity recorded at 5.21×1032cm-2 s-1
    Dec 27, 2010

    Good news on BEPCII commissioning keeps coming in! Following the peak luminosity at 4.91E32 a few days ago, BEPCII creats a record new high at 5.21E32

    More >>

  • IHEP and BIT join hands in talent training
    Dec 25, 2010

    The Institute of High Energy Physics (IHEP) and the Beijing Institute of Technology (BIT) would jointly launch an experimental class in fundamental physics in to cultivate young talents. The news was announced after a...

    More >>

  • The best gift for the New Year
    Dec 24, 2010

    4.91×1032cm-2s-1, another exhilarating new record of the collision luminosity of the Beijing Electron Positron Collider (BEPC) was achieved on December 23, 2010.

    More >>

  • Key progress achieved on cryostat for BEPCII SCC
    Dec 21, 2010

    The IHEP self-developed cryostat for BEPCII Spare Superconducting Cavity (SCC) passed the acceptance test on December 11 in Beijing, which marked an important milestone in the R&D of the BEPCII SCC. The cryostate is o...

    More >>

  • Joint design for CSNS infrastructure started
    Dec 17, 2010

    The China Spallation Neutron Source (CSNS) Project joins hands with the Architectural Design and Research Institute of Guangdong Province (GDADRI) in optimizing the preliminary design for the CSNS conventional facilit...

    More >>

  • BEPCII luminosity sets new record
    Dec 17, 2010

    The collision luminosity of the Beijing Electron Positron Collider (BEPC) after its upgrade reached 4.17×1032 cm-2s-1 for the first time on December 14, 2010, which marked a new milestone in the BEPCII commissioning.

    More >>

  • Feasibility of Daya Bay Neutrino Experiment physics reviewed
    Dec 01, 2010

    A seminar, which was organized by the Bureau of Basic Science of CAS, was held at the Institute of High Energy Physics on November 25th to review the feasibility of "the Physics Analysis of the Daya Bay Neutrino Oscil...

    More >>

 
    ALL:195 12345Next»Last
Copyright © 2002- Institute of High Energy Physics, CAS
Mailing address: 19B Yuquan Road, Shijingshan District, Beijing, China
Postal code: 100049 Fax: 86-10-88233374 TEL: 86-10-88233093
Quick Links
  • Contact Us
  • Phonebook
  • Highlights/News
  • Job Opportunities
  • Visa
  • How to get to IHEP
  • Maps
  • IHEP Guest House
Follow Us
  • Micro-blog
  • Wechat
  • LinkedIn
  • Micro-blog
  • Wechat
  • LinkedIn

Institute of High Energy Physics