• Sitemap|中文|CAS
  • Home
  • About
    • Introduction
    • Mission
    • Message from the Director
    • History
    • Directors
    • Scientists
    • Organization
    • Contact Us
    • Phonebook
    • International
  • Science
    • Research Themes
    • Research Divisions
    • Facilities
    • Key Laboratories
    • Achievements
    • Journals
    • Papers
  • Newsroom
    • Highlights/News
    • Upcoming Events
    • IHEP in the Media
    • Photo and Video Gallery
    • Brochures
    • Media Contacts
  • Join Us
    • Introduction
    • Job Opportunities
    • Postdoc Mentors
    • Talent Programs
    • Study at IHEP
    • Internships
    • Contact Us
  • Visiting IHEP
    • Before you come
    • After you arrive
    • Useful Information
    • Q&A
  • Home
  • About
    • Introduction
    • Mission
    • Message from the Director
    • History
    • Directors
    • Scientists
    • Organization
    • Contact Us
    • Phonebook
    • International
  • Science
    • Research Themes
    • Research Divisions
    • Facilities
    • Key Laboratories
    • Achievements
    • Journals
    • Papers
  • Newsroom
    • Highlights/News
    • Upcoming Events
    • IHEP in the Media
    • Photo and Video Gallery
    • Brochures
    • Media Contacts
  • Join Us
    • Introduction
    • Job Opportunities
    • Postdoc Mentors
    • Talent Programs
    • Study at IHEP
    • Internships
    • Contact Us
  • Visiting IHEP
    • Before you come
    • After you arrive
    • Useful Information
    • Q&A
Newsroom
  • 2025
  • 2024
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018
  • 2017
  • 2016
  • 2015
  • 2014
  • 2013
  • 2012
  • 2011
  • more
  • Horizontal Test for Super-conducting Spoke Cavity completed
    Horizontal Test for Super-conducting Spoke Cavity completed
    Sep 23, 2013

    In mid-September, a high-power test (horizontal test) for the ADS low-beta spoke cavity was successfully carried out. The success in horizontal test symbolizes a magnificent progress for the ADS proton linear accelera...

    More >>

  • CSNS inflatable seal developed
    CSNS inflatable seal developed
    Sep 16, 2013

    The China Spallation Neutron Source (CSNS) Project invited experts to the Institute of High Energy Physics (IHEP) to witness and test the CSNS inflatable seal on September 4.

    More >>

  • International workshop on neutrino factories held
    International workshop on neutrino factories held
    Sep 06, 2013

    The 14th International Workshop on Neutrino Factories: Super Beams and Beta Beams (NuFact2013) was held at the Institute of High Energy Physics (IHEP) from August 19 to 24 in Beijing. More than 150 scientists from 18 ...

    More >>

  • Waveguide system for Swedish MAX IV Project delivered
    Waveguide system for Swedish MAX IV Project delivered
    Sep 06, 2013

    After one year and a half, IHEP scientists recently finished and delivered over 200 accelerator components for the waveguide system at MAX IV Project to Lund University in Sweden, which marked that IHEP accelerator co...

    More >>

  • New Results from Daya Bay: Tracking the Disappearance of Ghostlike Neutrinos
    New Results from Daya Bay: Tracking the Disappearance of Ghostlike Neutrinos
    Aug 22, 2013

    The international Daya Bay Collaboration has announced new results about the transformations of elusive, ghostlike neutrinos, particles that carry invaluable clues about the makeup of the early universe. The latest fi...

    More >>

  • Next generation neutrino physicists trained
    Next generation neutrino physicists trained
    Aug 21, 2013

    The International Neutrino Summer School (INSS 2013), co-hosted by the Institute of High Energy Physics and Fermi National Accelerator Laboratory, took place at Beijing Shunxin Green Resort in the suburbs of Beijing f...

    More >>

  • The first pilot-scale production platform of metallofullerenes developed
    The first pilot-scale production platform of metallofullerenes developed
    Aug 13, 2013

    Scientists from the Institute of High Energy Physics (IHEP) recently announced that the first pilot-scale production platform of metallofullerenes had been successfully developed. In the review meeting, experts conclu...

    More >>

  • 18th BEPC Annual Meeting in Beijing
    18th BEPC Annual Meeting in Beijing
    Aug 13, 2013

    The 18th Annual Meeting of the Beijing Electron Positron Collider (BEPC) was held from August 2 to 4, 2013, in Beijing. Present at the meeting were more than 120 representatives from the Institute of High Energy Physi...

    More >>

  • First run of BSRF in 2013 concluded
    First run of BSRF in 2013 concluded
    Aug 08, 2013

    Fourteen beamlines and experimental stations with the Beijing Synchrotron Radiation Facility (BSRF) opened to users from June 9 to July 19, in 2013.

    More >>

  • China’s first L-band 10MeV/40kW electron accelerator for industrial radiation processing developed
    China’s first L-band 10MeV/40kW electron accelerator for industrial radiation processing developed
    Jul 19, 2013

    After five years of R&D, Chinese scientists developed the first domestic electron accelerator in the L-band with 10 MeV ~40kW. Jointly developed by the Institute of High Energy Physics and the Wuxi EL Pont Group, the ...

    More >>

 
    ALL:985 First«Pre6162636465Next»Last
Copyright © 2002- Institute of High Energy Physics, CAS
Mailing address: 19B Yuquan Road, Shijingshan District, Beijing, China
Postal code: 100049 Fax: 86-10-88233374 TEL: 86-10-88233093
Quick Links
  • Contact Us
  • Phonebook
  • Highlights/News
  • Job Opportunities
  • Visa
  • How to get to IHEP
  • Maps
  • IHEP Guest House
Follow Us
  • Micro-blog
  • Wechat
  • LinkedIn
  • Micro-blog
  • Wechat
  • LinkedIn

Institute of High Energy Physics