BEPC started to run in early 1989 with part of its time devoted to the work in the energy region of J/psi. Up until November 1991, ten million J/psi events have been collected for d ata analysis.

  From November 1, 1991 to January 20, 1992, Tau Mass was measured accurately. 

  When the storage ring of BEPC operated at 2 GeV in its dedicated mode for synchrotron radiation, the beam performances reached the designed requirements.

  Now the shaping of a National Laboratory which will be open to both home and abroad is on the pipeline.