30 |
The offline data quality monitoring of the BESIII end cap TOF system |
|
2018-08-29 |
Radiat. Detect. Technol. Methods 3, 58 (2019) |
|
|
29 |
Low transverse momentum track reconstruction based on the Hough transform for the BESIII drift chamber |
|
2019-08-29 |
Radiat. Detect. Technol. Methods 2, 20(2018); |
|
|
28 |
Study of MRPC technology for BESIII endcap-TOF upgrade |
|
2019-08-29 |
Radiat. Detect. Technol. Methods 1, 13 (2017) |
|
|
27 |
The study of time calibration for upgraded end cap TOF of BESIII |
|
2019-08-29 |
Radiat. Detect. Technol. Methods 1, 15 (2017) |
|
|
26 |
Study on Efficiency of Event Start Time Determination at BESIII |
|
2018-07-18 |
Chin. Phy. C38, 016201, 2014 |
|
|
25 |
An extended segment pattern dictionary for pattern matching tracking algorithm at BESIII |
|
2018-07-18 |
Chin. Phy. C37, 066202, 2013 |
|
|
24 |
The Online Data Quality Monitoring System at BESIII |
|
2018-07-18 |
Chin.Phys. C36, 622-627, 2012 |
|
|
23 |
A data quality monitoring software framework for the BESIII experiment |
|
2018-07-18 |
Chin. Phy. C36, 62-66, 2012 |
|
|
22 |
A GEANT4-based simulation model for the BESIII endcap time-of-flight system |
|
2018-07-18 |
Nucl.Instrum.Meth.A629 (2011) 87-92
|
|
|
21 |
The BESIII muon identification system |
|
2018-07-18 |
Nucl.Instrum.Meth.A614 (2010)196-205 |
|
|
20 |
Design and Construction of the BESIII Detector |
|
2018-07-18 |
Nucl.Instrum. Meth. A614 (2010)345-399 |
|
|
19 |
Aging study for the BESIII-type RPC |
|
2018-07-18 |
Nucl.Instrum. Meth. A |
|
|
18 |
Test of hadronic interaction models in GEANT4 at low energy using the BESIII data |
|
2018-07-18 |
Nucl.Instrum.Meth.A606 (2009) 700-707 |
|
|
17 |
A uniform geometry description for simulation, reconstruction and visualization in the BESIII experiment |
|
2018-07-18 |
Nucl.Instrum.Meth.A603 (2009) 325-327 |
|
|
16 |
First results of the RPC commissioning at BESIII |
|
2018-07-18 |
Nucl.Instrum.Meth.A599 (2009) 20-27 |
|
|
15 |
Introduction to BESIII EMC sub-trigger system |
|
2018-07-18 |
Nucl.Instrum.Meth. A598 (2009) 323-327 |
|
|
14 |
The construction of the BESIII experiment |
|
2018-07-18 |
Nucl.Instrum.Meth.A598 (2009) 7-11
|
|
|
13 |
Introduction to BESIII EMC sub-trigger system |
|
2018-07-18 |
Nucl.Instrum.Meth. A598 (2009) 323-327 |
|
|
12 |
Radiation effects on the mechanical properties of the material for the BESIII beam pipe supporting flange |
|
2018-07-18 |
Nucl.Instrum.Meth. A596 (2008) 347-353 |
|
|
11 |
A Monitor for the composition of the gas mixture of BESⅢ Muon chambers |
|
2018-07-18 |
Nucl.Instrum.Meth. A595 (2008) 520-525 |
|
|