Home   |   Contact   |   Sitemap   |   中文   |   CAS
Home|About Us|People|Press|Facilities|Int’l Cooperation|Papers|Research|Education & Training
Press
News
Upcoming Events
Reports from Overseas
Image Bank
IHEP Video

  Location: Home > Press > News
   CSNS RFQ Got Its First Beam TEXT SIZE: A A A
——

The Chins Spallation Neutron Source (CSNS) frontend was successfully installed on April 6, 2015. It took only 15 days for the sub-systems to work together and finish the integrated commissioning. On April 21, the RFQ of CSNS got its first negative hydrogen ion beam at 3 MeV with a pulse width of 50µs, the peak intensity reached 28mAthe designed value is 15mA.

The CSNS frontend is composed of negative hydrogen ion source, low energy transport line, mid-energy transport line and RFQ. They are the first batch of equipment that had been installed and commissioned, which lays a good foundation for the drift tube linac and the synchrotron.

The RFQ beam is one of the important milestones for the CSNS construction and beam commissioning. For this, a summary meeting was held by the Project Management. MA Li, deputy project director, spoke highly of the success at the meeting, commenting that it was a good beginning for the equipment installation and beam commissioning.

 
Copyright ©2002-2014 Institute of High Energy Physics, CAS
Questions and Comments to webmaster@ihep.ac.cn
mailing address:19B YuquanLu, Shijingshan District
Beijing, 100049 FAX: 86-10-88233374 TEL: 86-10-88233093