Home   |   Contact   |   Sitemap   |   中文   |   CAS
Home|About Us|People|Press|Facilities|Int’l Cooperation|Papers|Research|Education & Training
Press
News
Upcoming Events
Reports from Overseas
Multimedia

  Location: Home > Press > News
   CSNS Feasibility Study Report Reviewed at IHEP TEXT SIZE: A A A
——

  Entrusted by National Development and Reform Commission (NDRC), China International Engineering Consulting Corporation (CIECC) organized experts to review the CSNS Feasibility Study Report from October 19th to 21st at IHEP.

  The Review Committee was made up of 13 experts in the fields of accelerator, nuclear physicsreactor engineering, infrastructure and financial input.

  Mr. Ma Chaoying, Deputy Director of the Department of High Tech Business, CIECC, introduced the review principals and procedure.

  Academician Chen Hesheng, IHEP Director and Mr. Ma Li, Vice General Manager of CSNS project reported the project progress of the accelerator, target station, civil engineering, conventional facilities, environment protection, project funds and management to the review team.

  On behalf of the Review Committee, Academician He Duohui concluded that CSNS had met the requirements of the feasibility study report. The experts also proposed that some changes should be made in the acceptance requirements part of the feasibility report.

  Based on the report of the Review Committee, CIECC will submit a final report on CSNS Feasibility Study Report to NDRC.

 

 
Copyright ©2002-2014 Institute of High Energy Physics, CAS
Questions and Comments to webmaster@ihep.ac.cn
mailing address:19B YuquanLu, Shijingshan District
Beijing, 100049 FAX: 86-10-88233374 TEL: 86-10-88233093