Road construction began for the local part of the project 2016-09
Date:
2019-04-20
Road construction began for the local part of the project 2016-09
Construction began for the verification experiment of the muon detectors 2015-10
Field survey took place for LHAASO 2015-04
The Meaurement& control base Design
DESIGN