170 kW! Date: 2024-12-19 Author: On 11 October 2024, CSNS achieved the 170 kW beam power on target. By installing two magnetic alloy-loaded cavities in the Rapid Cycling Synchrotron (RCS), the accelerator team successfully increased the beam power on target to 170 kW. This not only significantly improved the efficiency of the facility but also validated the key technological route for increasing the beam power for the CSNS-II project.