Home   |   Contact   |   Sitemap   |   中文   |   CAS
Home|About Us|People|Press|Facilities|Int’l Cooperation|Papers|Research|Education & Training
Press
News
Upcoming Events
Reports from Overseas
Multimedia

  Location: Home > Press > News
   Plans reviewed, construction starts soon TEXT SIZE: A A A
——

Supported by the local government, the ground leveling plan for the site of China Spallation Neutron Source (CSNS) Project
 
 the construction site
was  reviewed and finalized by experts on April 1st, and the earthwork kicked off on April 10th.

The geological survey last December showed the bedrock fully met the construction requirements. Since the facility relies on the integrity of the bedrock, blasting techniques become the key element and called for careful consideration. Experts from the Chinese Academy of Sciences and Guangdong Province appraised the blasting plan on May 15th with the conclusion that the plan was feasible.

With the above plans reviewed and the preliminary design reported finished, the project construction will soon start.

 
Copyright ©2002-2014 Institute of High Energy Physics, CAS
Questions and Comments to webmaster@ihep.ac.cn
mailing address:19B YuquanLu, Shijingshan District
Beijing, 100049 FAX: 86-10-88233374 TEL: 86-10-88233093